November 16, 2026
Press Pass USA
YOUR NEWS. YOUR AMERICA.
Local

Water pumping resumes to hold back toxic plume under Chillicothe after well shaft fractures

Chillicothe, Ohio  •  November 16, 2026  •  By Press Pass USA
An aerial view of the paper mill in Chillicothe, OhioPhoto: Doral Chenoweth III / Columbus Dispatch (file photo)

Water is again being pumped to contain the toxic plume beneath Chillicothe after a pump failure at U.S. Paper Mill last week, the company said Monday — a decades-old shaft had fractured in the well that had been holding the plume back, and the mill switched to a backup well that had been sitting dormant.

The company provided the update on Nov. 16, saying the shaft in Well 18 could not be repaired quickly, so it shifted pumping to Well 17. The water table level is being maintained, the company said.

When the fracture occurred, U.S. Paper Mill alerted the Ohio Environmental Protection Agency and the City of Chillicothe about the malfunction.

Since acquiring the closed Pixelle Specialty Solutions plant last year, U.S. Paper Mill has been pumping water to keep the water table from rising high enough to reach the plume, as a voluntary service to Ohio EPA and Howmet. The chemicals were spilled decades ago by the WearEver manufacturing plant, which closed in the 1990s. The wells pump the water to the plant to keep the water table in check and away from the plume.

Employees make hourly rounds every shift to check the wells, along with maintenance and pump operation that costs at least $1 million per year, according to the company's news release.

"I am grateful to all our colleagues who prioritized the health and safety of the community we love over the operations of our business," Utility Superintendent Aaron Anders said. "We are pleased to see that the well water is being pumped, and we will continue to monitor the situation, as we always have."

In addition to containing the plume, the company's commitment includes receiving and processing leachate from the Paint Street Landfill, continued compliance with state water flow and air quality permits, and elimination of odor through closure of the former pulp mill.

Sources: Chillicothe Gazette, "U.S. Paper Mill restores water pumping to contain toxic plume" (Nov. 16, 2026, full text verified); J News Network, "The plume has moved before: One well now stands between Chillicothe and the Wear-Ever plume" (Nov. 16, 2026, verified, reporting the same Nov. 16 company news release).

Sponsored Mr Cat
MR CAT ADVERTISINGDOES YOUR BUSINESS NEED MORE CUSTOMERS?
VISIT SITE →
← Back to homepage